• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 8. Charge System with Machine
AIR CONDITIONER/HEATER BLOWER MOTOR LOW SPEED RESISTOR REPLACEMENT

Maintenance Manual For Hydraulic Excavator Type 1 With Hydraulic Thumb And Quick Latch -4 Page Navigation
  404    405    406    407    408  409  410    411    412    413    414  
img
.
TM 5-3805-294-23-4
0540
AIR CONDITIONER SYSTEM CHARGING
11.
Remove low-pressure (blue) hose (Figure 9, Item 6) from service valve (Figure 9, Item 4).
12.
Remove high-pressure (red) hose (Figure 9, Item 5) from service valve (Figure 9, Item 2).
13.
Install low-pressure cap (Figure 9, Item 3) to service valve (Figure 9, Item 4).
14.
Install high-pressure cap (Figure 9, Item 1) to service valve (Figure 9, Item 2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Perform air conditioner leak test. (WP 0537)
2.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0540-10


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.