TM 5-3805-294-23-4
0541
INSTALLATION - Continued
1
3
2
HYEX02328
Figure 2. Resistor Installation.
2.
Install two screws (Figure 2, Item 1) to air conditioner/heater blower motor low speed resistor (Figure 2, Item
2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install air conditioner/heater unit. (WP 0551)
2.
Install cab rear wiring harness bracket. (WP 0572)
3.
Install cab rear tray and rear cover. (WP 0566)
4.
5.
6.
7.
8.
Service air conditioner refrigerant. (WP 0540)
9.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE