• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 1. Resistor Removal
AIR CONDITIONER/HEATER BLOWER MOTOR REPLACEMENT

Maintenance Manual For Hydraulic Excavator Type 1 With Hydraulic Thumb And Quick Latch -4 Page Navigation
  407    408    409    410    411  412  413    414    415    416    417  
img
. . . . . . . . .
TM 5-3805-294-23-4
0541
INSTALLATION - Continued
1
3
2
HYEX02328
Figure 2. Resistor Installation.
2.
Install two screws (Figure 2, Item 1) to air conditioner/heater blower motor low speed resistor (Figure 2, Item
2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Install air conditioner/heater unit. (WP 0551)
2.
Install cab rear wiring harness bracket. (WP 0572)
3.
Install cab rear tray and rear cover. (WP 0566)
4.
Install seat. (WP 0580)
5.
Install seat belt. (WP 0579)
6.
Replace receiver dryer. (WP 0538)
7.
Connect negative battery cable. (WP 0521)
8.
Service air conditioner refrigerant. (WP 0540)
9.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0541-3/4 blank


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.