TM 5-3805-294-23-4
0623
RIGHT SIDE LINE INSTALLATION - Continued
13
14
11
15
16
17
11
11
12
11
10
9
HYEX01778
Figure 3.
Right Side Line Installation.
2.
Lightly lubricate O-ring (Figure 3, Item 14) with clean oil.
3.
Install O-ring (Figure 3, Item 14) to line (Figure 3, Item 11).
4.
Install hose (Figure 3, Item 13) to line (Figure 3, Item 11).
5.
Lightly lubricate O-ring (Figure 3, Item 12) with clean oil.
6.
Install O-ring (Figure 3, Item 12) to line (Figure 3, Item 11).
7.
Install hose (Figure 3, Item 10) to line (Figure 3, Item 11).
END OF TASK
LEFT SIDE LINE INSTALLATION
WARNING
NOTE
Install hoses and fittings as noted during removal.
Install clamps as noted during removal.
1.
Install line (Figure 4, Item 2) to boom (Figure 4, Item 9) with two screws (Figure 4, Item 6), washers (Figure 4,
Item 7), and clamps (Figure 4, Item 8).