TM 5-3805-294-23-4
FIELD MAINTENANCE
ARM CYLINDER REPLACEMENT
INITIAL SETUP:
Materials/Parts (cont.)
Tools and Special Tools
Tool Kit, General Mechanic's: Automotive
O-ring (Volume 5, WP 0798, Table 1, Item 119)
(Volume 5, WP 0796, Table 2, Item 119)
Qty: 1
Cap and Plug Set (Volume 5, WP 0796, Table 2,
Lockwasher (Volume 5, WP 0798, Table 1, Item
Item 55)
18) Qty: 1
Gloves, Rubber (Volume 5, WP 0796, Table 2,
Lockwasher (Volume 5, WP 0798, Table 1, Item
Item 55)
17) Qty: 2
Goggles, Industrial (Volume 5, WP 0796, Table 2,
O-ring (Volume 5, WP 0798, Table 1, Item 104)
Item 58)
Qty: 1
Lifting Device, Minimum Capacity 1000 lb
Pan, Drain (Volume 5, WP 0796, Table 2, Item
Personnel Required
55)
Construction Equipment Repairer (2)
Socket, Impact, Standard, 6 Pt, 3/4 in. Drive, 30mm
(Volume 5, WP 0796, Table 2, Item 55)
Wrench, Torque, 50-250 lb-ft (68-339 Nm),
References
3/8 in. Drive (Volume 5, WP 0796, Table 2,
TM 5-3805-294-10 (Volume 5, WP 0794)
Item 129)
TM 5-3805-294-24P: Fig. 163, Fig. 165, Fig. 225
Wrench, Torque, 90-600 lb-ft (122-813 Nm),
(Volume 5, WP 0794)
3/8 in. Drive (Volume 5, WP 0796, Table 2,
DA FORM 5988-E or DA FORM 2404 (Volume 5,
Item 130)
WP 0794)
Volume 5, WP 0696
Materials/Parts
Lubricating Oil, Engine OE/HDO 15W-40
(Volume 5, WP 0797, Table 1, Item 18)
Equipment Condition
Rags, Wiping (Volume 5, WP 0797, Table 1, Item
Bucket removed (TM 5-3805-294-10). (Volume 5,
34)
WP 0794)
Tags (Volume 5, WP 0797, Table 1, Item 52)
Tie Wraps (Volume 5, WP 0797, Table 1, Item
Time to Complete
56)
1.7 Hour(s)
Seal (Volume 5, WP 0798, Table 1, Item 237)
Qty: 4
REMOVAL
1.
Start machine (TM 5-3805-294-10).
2.
Raise boom (Figure 1, Item 1) to allow for clearance.
0624-1