• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
FOLLOW-ON MAINTENANCE
Figure 1. Barrier Grapple Lift Bail Removal.

Maintenance Manual For Hydraulic Excavator Type 1 With Hydraulic Thumb And Quick Latch -4 Page Navigation
  1094    1095    1096    1097    1098  1099  1100    1101    1102    1103    1104  
img
.
TM 5-3805-294-23-4
0643
FIELD MAINTENANCE
BARRIER GRAPPLE LIFT BAIL REPLACEMENT
INITIAL SETUP:
Personnel Required
Tools and Special Tools
Construction Equipment Repairer 91L (1)
Tool Kit, General Mechanic's: Automotive
(Volume 5, WP 0796, Table 2, Item 119)
Handle, 3/4" Drive, 19 1/4" OAL (Volume 5,
References
WP 0796, Table 2, Item 55)
TM 5-3805-294-24P: Fig. 146 (Volume 5,
Socket, Socket Wrench, 1-13/16 in., 3/4 in. Drive
WP 0794)
(Volume 5, WP 0796, Table 2, Item 55)
DA FORM 5988-E or DA FORM 2404 (Volume 5,
Wrench, Open End, Standard Length, 1-13/16 in.
WP 0794)
(Volume 5, WP 0796, Table 2, Item 55)
Time to Complete
Materials/Parts
0.5 Hour(s)
Penetrating Oil (Volume 5, WP 0797, Table 1, Item
31)
Locknut (Volume 5, WP 0798, Table 1, Item 143)
Qty: 2
REMOVAL
NOTE
Note position of washers prior to removal of bolts.
1.
Place grapple assembly on the ground to allow access to grapple lift bail (Figure 1, Item 1) being removed.
0643-1


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.