TM 5-2420-230-24-1
Upon completion of maintenance activities, restore power and return vehicle to operational readiness by doing the following:
(1)
(2)
(3)
(4)
(5)
(6)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position, as required
This Task Covers:
a. Draining
b. Replacement
c. Filling
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
Tools and Special Tools
ground.
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
"Do Not Operate" tag attached
Materials/Parts
to ignition switch.
Engine hood opened.
Drawings Required
Personnel Required
MOS 62B, Construction Equipment Repairer
References
Estimated Time to Complete
None
a. Draining.
Serious damage to engine can occur by operating engine with incorrect quantity of oil in sump. Failure
to comply may result in damage to equipment.
(1)
Ensure engine has reached normal operating temperature.
Change 1