• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
POWER STEERING GEAR BOX REPLACEMENT - Continued
POWER STEERING GEAR BOX REPLACEMENT - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  224    225    226    227    228  229  230    231    232    233    234  
img
TM 5-2420-230-24-1
b. Installation.
NOTE
Ensure all hoses, wires, and tubes are reconnected to positions noted prior to removal.
Install cable ties as necessary.
Ensure power steering pump to reservoir hose assembly is clean and contains no foreign matter.
(0.1) Install fitting (22) and elbow (21) on power steering gear box (1).
(0.2) Install power steering gear box (1), bolt (16), washer (17), washer (18), and new self-locking nut (20) on
frame (15). Torque nuts to 191 lbf/ft (259 Nm).
(1)
Install three bolts (11), washers (12), washers (13), and new self-locking nuts (14) on power steering box (1) and
frame (15). Torque nuts to 191 lbf/ft (259 Nm).
(2)
Compress slip joint (9) and install U-joint clamp (8) on steering box assembly shaft (10).
(3)
Install bolt (4), washer (5), washer (6), and new self-locking nut (7) on U-joint clamp (8).
(4)
Install power steering pump to reservoir hose assembly (3) on power steering gear box (1).
(5)
Install reservoir hose assembly (2) on power steering gear box (1).
Change 1
5-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.