• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
OPERATOR'S SEAT REPLACEMENT. - Continued
OPERATOR'S SEAT BELT REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  511    512    513    514    515  516  517    518    519    520    521  
img
. . . . . . .
TM 5-2420-230-24-1
13-11. OPERATOR'S SEAT BELT REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Para 15-4
Air system drained.
Para 13-8.2
Operator's seat anchor buckle
Tools and Special Tools
Tool kit, general mechanics, Item 38, Appendix B
removed.
Materials/Parts
Drawings Required
None
TM 5-2420-230-24P Figure 184
Personnel Required
Estimated Time to Complete Task
MOS 62B, Construction Equipment Repairer
Refer to MAC in Appendix B
References
None
a. Removal.
(1)
Lift lever (1) and hold.
(2)
Push lower seat cushion (2) forward and remove from slides (3).
Change 1
13-16


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.