TM 5-2420-230-24-1
(8)
Install duct (2) on dash (4) with three screws (3).
(9)
Install six louvers (1) in duct (2).
c. Follow-On Maintenance.
END OF TASK
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Cooling system drained.
Materials/Parts
Drawings Required
Figure 188
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1