• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
AUXILIARY DEFROSTER DUCTING REPLACEMENT. - Continued
AUXILIARY DEFROSTER HEATER MAINTENANCE. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  567    568    569    570    571  572  573    574    575    576    577  
img
. . . . . . . . . . . .
TM 5-2420-230-24-1
(8)
Install duct (2) on dash (4) with three screws (3).
(9)
Install six louvers (1) in duct (2).
c. Follow-On Maintenance.
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
13-36. AUXILIARY DEFROSTER HEATER MAINTENANCE.
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, general mechanics, Item 38, Appendix B
TM or Para
Condition Description
Para 9-4
Cooling system drained.
Materials/Parts
Cap and plug set, Item 4, Appendix C
Drawings Required
O-rings, Item 156.1, Appendix D (2)
TM 5-2420-230-24P
Figure 188
Tags, identification, Item 63, Appendix C
Ties, cable, Item 68, Appendix C
Estimated Time to Complete Task
Washer, lock, Item 290.1, Appendix D (4)
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1
13-72


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.