TM 5-2420-230-24-1
c. Follow-On Maintenance.
(1)
(2)
(3)
Plug in electrical outlet and ensure battery trickle charger and block heater are operating properly
(4)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Equipment Conditions
Tools and Special Tools
TM or Para
Condition Description
Battery box opened.
Electrical outlet unplugged.
Hydraulic reservoir step plate
Materials/Parts
removed.
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1