• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 4. Lower Line Installation.
AUXILIARY CIRCUIT SECONDARY RELIEF SOLENOID VALVE REPLACEMENT

Maintenance Manual For Hydraulic Excavator Type 1 With Hydraulic Thumb And Quick Latch -4 Page Navigation
  1066    1067    1068    1069    1070  1071  1072    1073    1074    1075    1076  
img
. .
TM 5-3805-294-23-4
0637
LOWER LINE INSTALLATION - Continued
12.
Install hose (Figure 4, Item 1) to line (Figure 4, Item 2).
END OF TASK
FOLLOW-ON MAINTENANCE
1.
Release vacuum from hydraulic reservoir. (WP 0620)
2.
Connect negative battery cable. (WP 0521)
3.
Perform the Standard Follow-On Maintenance Instructions. (Volume 3, WP 0384)
END OF TASK
END OF WORK PACKAGE
0637-8


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.