• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHARGING PUMP REPLACEMENT. - Continued
ENGINE OIL SAMPLING VALVE ASSEMBLY REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  191    192    193    194    195  196  197    198    199    200    201  
img
. . . . . . . . .
TM 5-2420-230-24-1
4-12. ENGINE OIL SAMPLING VALVE ASSEMBLY REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Pan, drain, Item 29, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para 4-4
Engine oil drained.
Materials/Parts
Drawings Required
Compound, sealing, pipe thread, Item 23, Appendix C
TM 5-2420-230-24P Figure 157
Ties, cable, Item 68, Appendix C
Estimated Time to Complete
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
Hot parts can burn personnel. Let hot parts cool
before starting work. Avoid contact with hot oil.
Failure to comply may result in serious injury.
NOTE
Remove cable ties as necessary.
(1)
Place drain pan beneath oil sampling valve (1).
(2)
Remove oil sampling valve (1) from vehicle.
(3)
If required, remove hose (2) from adaptor (3) and
reducer (4).
(4)
If required, remove adaptor (3), reducer (4), hose (5)
T-fitting (6), and elbow (7) from vehicle.
Change 1
4-42


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.