(4)
Position bypass solenoid (5) on bracket (6)
and install two bolts (4), four washers (3), and
two new self-locking nuts (2).
(5)
Install three hydraulic lines (1) on bypass
f. Follow-On Maintenance.
(1)
Start engine and check for leaks
(2)
(3)
Functionally test FEL cylinders
(4)
(5)
If valve block was replaced, apply new valve
(6)
(7)
(8)
Deleted.
END OF TASK
This Task Covers:
a. Removal
b. Disassembly
c. Repair
d. Assembly
e. Installation
f. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Personnel Required
None
MOS 62B, Construction Equipment Repairer (2)
Tools and Special Tools
References
None
Equipment Conditions
Equipment, suitable lifting
TM or Para
Condition Description
Backhoe swung to one side.
Hydraulic system pressure
Materials/Parts
released.
Air tank (20 L) removed.
Drawings Required
Estimated Time to Complete Task
Change 1