TM 5-2420-230-24-1
e. Follow-On Maintenance.
(1)
(2)
(3)
END OF TASK
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
None
"Do Not Operate" tag attached
to ignition switch.
NonePersonnel Required
Hose reel stowed (cover
MOS 62B, Construction Equipment Repairer
removed).
References
Drawings Required
None
Estimated Time to Complete Task
a. Removal.
(1)
Remove two nuts (1) and screws (2) from top two mounting blocks (3) and bracket (4).
(2)
Remove two mounting blocks (3) and roller (5) from rollers (6) and (7).
Change 1