TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions
None
TM or Para
Condition Description
Vehicle positioned on level
ground.
Tools and Special Tools
Parking brake applied.
Engine shut OFF.
Electrical master switch OFF.
Materials/Parts
"Do Not Operate" tag attached
to ignition switch.
Hose reel stowed (cover
removed).
Personnel Required
Drawings Required
MOS 62B, Construction Equipment Repairer
References
None
Estimated Time to Complete Task
a. Removal.
The spring motor is under tension when installed. To prevent injury, relieve tension before removing
spring motor. Failure to comply may result in injury or death to personnel.
NOTE
Perform Steps (1) through (3) to release tension on spring motor.
(1)
Remove two nuts (1), screws (2), and hose stop (3) from hoses (4).
(2)
Wind hose assembly (4) through roller assembly (5) onto hose reel (6).
10-77
Change 1