• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
CHAPTER 20 COLD WEATHER KIT
COLD WEATHER KIT INITIAL INSTALLATION.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  661    662    663    664    665  666  667    668    669    670    671  
img
. . . . . . . . . . . . .
TM 5-2420-230-24-1
20-2. VEHICLE PREPARATION AND ISOLATION.
Prior to commencement of maintenance on the Interim High-Mobility Engineer Excavator (IHMEE) vehicle, perform the
following procedure:
(1)
Ensure vehicle is positioned on level ground.
(2)
Ensure parking brake is applied (TM 5-2420-230-10).
(3)
Raise FEL, install maintenance arm, and lower FEL onto maintenance arm, as required (TM 5-2420-230-10).
(4)
Shut OFF engine (TM 5-2420-230-10).
(5)
Place electrical master switch in OFF position (TM 5-2420-230-10).
(6)
Attach "Do Not Operate" tag to ignition switch (TM 5-2420-230-10).
20-3. RESTORE IHMEE TO OPERATIONAL READINESS.
Upon completion of maintenance activities, restore power and return vehicle to operational readiness using the following
procedure:
(1)
Place electrical master switch in ON position (TM 5-2420-230-10).
(2)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
(3)
Ensure parking brake is applied (TM 5-2420-230-10).
(4)
Start engine (TM 5-2420-230-10).
(5)
Raise FEL, remove maintenance arm, and lower FEL to ground or travel position as required
(TM 5-2420-230-10).
(6)
Complete necessary documents and return IHMEE to relevant authority.
Complete necessary documents and return IHMEE to relevant authority.
Change 1
20-2


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.