TM 5-2420-230-24-1
This Task Covers:
a. Arctic Heater
b. Block Heater
c. Trickle Charger
d. Electrical Outlet
e. Ether Start
f. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions -- Continued
None
removed.
Tools and Special Tools
Air cleaner/stowage box
removed.
Fuel tank step plate removed.
Hydraulic reservoir step plate
removed.
Batteries removed.
Materials/Parts
Cooling system drained.
Compound, sealing, Loctite 567, Item 22, Appendix C
Kit, cold weather installation, (Michele 1)
Drawings Required
Figure 26
Figure 32
Figure 33
Figure 41
Figure 44
Personnel Required
Figure 48
MOS 62B, Construction Equipment Repairer (2)
Figure 50
Figure 146
References
Figure 189
TM 43-0139
Figure 202
Figure 203
Equipment Conditions
Figure 207
TM or Para
Condition Description
FEL raised and maintenance
Estimated Time to Complete Task
arm installed.
PDP door opened.
Hood raised.
Hot parts and fluids can burn personnel. If vehicle has been operating, let engine cool before starting
work. Avoid contact with hot fluid when removing hoses or fittings. Failure to comply may result in
serious injury or death to personnel.
Change 1