Home
Download PDF
Order CD-ROM
Order in Print
A/C EVAPORATOR ASSEMBLY MAINTENANCE. - Continued
CHAPTER 20 COLD WEATHER KIT
Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
659
660
661
662
663
664
665
666
667
668
669
TM
5-2420-230-24-1
(4)
Connect
electrical
connector
(5)
to
evaporator
assembly
(3).
(5)
Install
two
drain
lines
(4)
on
evaporator
assembly
(3).
(6)
Install
hose
clamp
(1)
and
air
duct
(2)
on
evaporator
assembly
(3).
e.
Follow-On
Maintenance.
(1)
Install
A/C
cover
(Para
19-5).
(2)
Charge
A/C
system
(Para
19-4).
END
OF
TASK
Change 1
19-22