TM 5-2420-230-24-1
b. Installation.
NOTE
Ensure all hoses, wires and tubes are
reconnected to positions noted prior to
removal.
Install cable ties as necessary.
(1)
Install receiver-drier (2) on bracket (4) and
tighten hose clamp (3).
(2)
Install two hoses (1) on receiver-drier (2).
c. Follow-On Maintenance.
(1)
(2)
(3)
END OF TASK
19-10. A/C EVAPORATOR ASSEMBLY MAINTENANCE.
This Task Covers:
a. Removal
b. Disassembly
c. Assembly
d. Installation
e. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
A/C system purged.
A/C cover removed.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
Change 1