• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER ASSEMBLY MAINTENANCE. - Continued
COMBUSTION AIR BLOWER REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  684    685    686    687    688  689  690    691    692    693    694  
img
. . . .
TM 5-2420-230-24-1
(5)
Install fuel pump mounting bracket (8) on
arctic heater box (2) with screw (9),
washer (7), and nut (6).
(6)
Install arctic heater cover (5) on arctic heater
box (2) with two washers (4) and screws (3).
Remove all jewelry such as rings, dog tags,
bracelets, etc. If jewelry or tools contact
positive electrical circuits, a direct short may
result. Damage to equipment and injury or
death to personnel may occur.
(7)
Connect electrical connector (1) on arctic heater box (2).
e. Follow-On Maintenance.
(1)
Fill cooling system (Para 9-4).
(2)
Start engine and functionally test arctic heater (TM 5-2420-230-10).
(3)
Check all hoses for leaks.
(4)
Shut OFF engine (TM 5-2420-230-10).
(5)
Remove "Do Not Operate" tag from ignition switch (TM 5-2420-230-10).
END OF TASK
Change 1
20-25


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.