• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
ARCTIC HEATER ASSEMBLY MAINTENANCE. - Continued
COMBUSTION AIR BLOWER REPLACEMENT. - Continued

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  685    686    687    688    689  690  691    692    693    694    695  
img
. . . . . . . . . .
TM 5-2420-230-24-1
20-6. COMBUSTION AIR BLOWER REPLACEMENT.
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
Tool kit, electrical contact, Item 37, Appendix B
TM or Para
Condition Description
Tool kit, general mechanics, Item 38, Appendix B
Para 20-10
Glow pin removed.
Materials/Parts
Drawings Required
Cloth, lint-free, Item 10, Appendix C
TM 5-2420-230-24P Figure 207
Seal and gasket set, Item 234.1, Appendix D
Tags, identification, Item 63, Appendix C
Estimated Time to Complete Task
Refer to MAC in Appendix B
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
NOTE
Tag all wires and note their positions before removal.
(1)
Remove two wires (1) from connector (2).
(2)
Remove three screws (3) and air blower (4) from heat exchanger outer casing (5).
Change 1
20-26


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.