TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Installation
c. Follow-On Maintenance
INITIAL SETUP
Test Equipment
References
None
None
Tools and Special Tools
Equipment Conditions
TM or Para
Condition Description
Glow pin removed.
Materials/Parts
Drawings Required
Estimated Time to Complete Task
Personnel Required
MOS 62B, Construction Equipment Repairer
a. Removal.
NOTE
Tag all wires and note their positions before removal.
(1)
Remove two wires (1) from connector (2).
(2)
Remove three screws (3) and air blower (4) from heat exchanger outer casing (5).
Change 1