• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
COMBUSTION AIR BLOWER REPLACEMENT.
CONTROL UNIT REPLACEMENT.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  686    687    688    689    690  691  692    693    694    695    696  
img
.
TM 5-2420-230-24-1
.
(3)
Remove gasket (6) from air blower (4). Discard gasket.
(4)
Remove burner (7) and seal (8) from heat exchanger outer casing (5).
(5)
Remove seal (8) from burner (7). Discard seal.
b. Installation.
NOTE
Ensure all wires are reconnected to positions
noted prior to removal.
(1)
Install new seal (8) on burner (7).
(2)
Install seal (8) and burner (7) on heat
exchanger outer casing (5).
(3)
Install new gasket (6) on air blower (4).
(4)
Install air blower (4) on heat exchanger outer
casing (5) with three screws (3).
(5)
Install two wires (1) on connector (2).
c. Follow-On Maintenance.
Install glow pin (Para 20-10).
END OF TASK
Change 1
20-27


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.