STEERING DAMPER REPLACEMENT - Continued
RESTORE IHMEE TO OPERATIONAL READINESS.

Maintenance Manual For Interim High-Mobility Engineer Excavator
Page Navigation
  250    251    252    253    254  255  256    257    258    259    260  
img
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
TM 5-2420-230-24-1
CHAPTER 6
SUSPENSION
Contents
Para
Page
General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-1
6-1
Vehicle Preparation and Isolation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-2
6-1
Restore IHMEE to Operational Readiness. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-3
6-2
Check Strap Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-4
6-2
Airbag Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-5
6-4
Bump Stop Replacement.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-6
6-7
Ride Level Valve (RLV) and Linkage Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-7
6-8
Shock Absorber Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-8
6-11
Control Arm Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-9
6-12
Sway Bar Replacement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
6-10
6-14
6-1. GENERAL.
This section identifies components associated with the suspension system. It details routine maintenance activities and
removal and installation procedures for the following components:
Check straps
Shock absorbers
Airbags
Bump stops
Sway bar
Ride Level Valves (RLV) and linkages
Control Rods
6-2. VEHICLE PREPARATION AND ISOLATION.
Prior to performing any maintenance on the Interim High-Mobility Engineer Excavator (IHMEE), perform the following
procedure:
(1)
Ensure vehicle is positioned on level ground.
(2)
Ensure parking brake is applied (TM 5-2420-230-10).
(3)
Raise Front-End Loader (FEL), install maintenance arm, and lower FEL onto maintenance arm, as required
(TM 5-2420-230-10).
(4)
Shut OFF engine (TM 5-2420-230-10).
(5)
Place electrical master switch in OFF position (TM 5-2420-230-10).
(6)
Attach "Do Not Operate" tag to ignition switch (TM 5-2420-230-10).
6-1