TM 5-2420-230-24-1
This Task Covers:
a. Removal
b. Inspection
c. Installation
d. Follow-On Maintenance
INITIAL SETUP
Test Equipment
Equipment Conditions (Cont.)
None
TM or Para
Condition Description
Hydraulic reservoir step plate
Tools and Special Tools
removed.
Fuel tank step plate removed.
FEL arms removed.
Nose cone removed.
Transmission oil cooler
Equipment, suitable lifting
removed.
Materials/Parts
Coolant reservoir removed.
Steering shafts removed.
Miter box removed.
Washer bottle assembly and
bracket removed.
Ether start atomizer removed (if
equipped).
Ether start thermostat removed
(if equipped).
Engine block heater removed (if
equipped).
Drawings Required
Figure 1
Figure 23
Figure 25
Figure 27
Personnel Required
Figure 75
MOS 62B, Construction Equipment Repairer (3)
Figure 96
Figure 97
References
Figure 121
None
Figure 144
Equipment Conditions
Figure 156
TM or Para
Condition Description
Figure 192
Firewall cover removed.
Estimated Time to Complete
Belly plates removed.
Air system drained.
Engine oil drained.
Transmission oil drained.
a. Removal.
NOTE
Tag all hoses, wires, and tubes and note their positions before removal.
Cap and plug all tubes, hoses, and fittings upon removal.
Remove cable ties as necessary.
Ensure all hoses, wires, and tubes are disconnected and clear before removal.
Change 1